National Repository of Grey Literature 27 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
The viticulture Lahofer
Čech, Richard ; ing.arch. Lukáš Ležatka, Ph.D (referee) ; Pavlovský, Tomáš (advisor) ; Kacálek, Petr (advisor)
This bachelor thesis extends the bachelor’s studio project aimed at creating a survey on a new building for Vinařství Lanhofer company. The considered area lies in the territory of Dobšice near Znojmo and with its slightly rolling landscape is used for agricultural purposes. The mentioned trapezoid building site faces southwest, at the time was covered with vineyard and was bordered by minor roads connecting the plot to Dobšice and Suchohrdly. Building a new production site that would be able to produce up to 60 thousand bottles of wine, could be also used as storage space or would incorporate related services was intended. There were premises for public use, formal events or wine-tasting planned. The layout included restaurant with outside seating, sanitary facilities both for visitors and employees. Such a large-scale production of wine could be almost considered an industrial production that set up the main idea of the design. The basic clue of this project is searching an ideal shape of the production area that – in historical context of industrial buildings – is saw-shaped rooftop silhouette. The material concept of the building is based on visual and logical separating of production premises from public spaces that had been achieved by distinguishing both areas by using different facade cover. Stainless steel representing production environment and Cor-Ten patina steel panelling describing eternal wine maturation.
Construction technology study stage assembly of reinforced concrete load-bearing structure of the hall
Hubáček, Lukáš ; Venkrbec, Václav (referee) ; Diaz, Yvetta (advisor)
The object of work is a stage of assembly of reinforced concrete supporting structure construction of universal hall with annex within the project Technology Park Holešov. The property consists of indoor and part two-storey annex. The thesis contains a technical report object, situation, including wider relations routes, itemized budget including bills of quantities, technological specification for mounting the skeleton, the principles of organization of construction, the timetable proposed mechanical assembly, inspection and test plan and occupational safety and health.
Building Construction Project for Industrial and Administrative Building ATX
Šrámek, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also including working drawings.
The Extension of the Business Incubator - South, Rough Superstructure
Sankot, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of thic bachelor thesis is processing of a technological solution of the rough top construction of the Business Incubator in Brno. It is a new four-storey, non-cellular building for administrative and office activities. The subject of this thesis is processing of a technological regulation for the prefabricated reinforced concrete skeleton. The next parts of the thesis, focused on the phase of the rough top construction, are: technical report, situation with wider relations of the transport routes, plan of the construction organization with the drawing of the building site facilities (equipment), itemized budget with the statement of acreages, schedule of work, inspection and test schedule, design of the mechanical (machine) assembly and the safety of work of the (solved) technological phase.
Newly-built multipurpose building in Boskovice, execution of superstructure.
Sojka, Petr ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The theme of my bachelor thesis is processing technology of rough superstructure of new multi-building owned by Lamex. This is partly double-deck building consisting of storage, administrative and retail space. The subject of my work is processing technology prescription for construction of precast concrete frame and construction of steel fibre reinforced concrete floor. The other parts of this thesis, which with focused on rough superstructure are technical report, construction plan, budget with statement of merit, time schedule, wokers‘ balance, site equipment, safety of workers.
Multifunctional House
Šimek, Pavel ; Čtvrtníčková, Kateřina (referee) ; Kolář, Radim (advisor)
Master´s thesis is designed as a complete documentation of a multifunctional house. The multifunctional house is located in the town Nová Paka and functionally designed as a restaurant, garages and 8 flats. Built-up area is 886.95 square meters. The building is covered with a flat roof. The supporting structure is designed prefabricated reinforced concrete frame. Infill walls are made of clay blocks Porotherm. The house is insulated contact system ETICS. The thesis contains a static layout, fire safety, energy saving and safety in use. Drawings were processed with software for design - ArchiCAD.
Motel
Šich, Pavel ; Čtvrtníčková, Kateřina (referee) ; Kolář, Radim (advisor)
The project was prepared with complete documentation of a new Motel at the level of building construction documentation. Motel has a capacity of 25 double beds and one single bed for the disabled. Built-up area is 984,2 square meters. Enclosure is designed as a flat roof. The supporting structure of the building consists of prefabricated reinforced concrete frame. Building design emphasizes on static solution and layout, fire safety, energy saving and safety of use. Drawings were processed in software for design - AutoCad
Preparation and organization of the production area's construction facility
Řeháček, Martin ; Stehlíková, Jana (referee) ; Vlčková, Jitka Laura (advisor)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
LIWA manufacturing facility in Pelhřimov - implementation of construction
Jůn, Michal ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
The aim of the thesis is the process of building technological project LIWA manufacturing facility in Pelhřimov. It deals mainly a technological process for the realization of the main building. The thesis contains a technical report, technological specification, control and test plan. Other parts of the work are time and financial plan, machine and mechanic design, project about equipment of construction site and time schedule. The annexes are further addressed drawings of the building site equipment.
Gmont Cable s.r.o., cable manufacturing plant
Vacek, Václav ; Vostrejž, Dušan (referee) ; Boleslavská, Yvona (advisor) ; Sobotka, Jindřich (advisor)
The bachelor thesis deals with the drawing of the industrial plant, namely the work is focused on the part of the administrative and the employees' background. The assignment of the atelier work is a newly built factory of Gmont Cable s.r.o., which is focused on the production and installation of cable harnesses, cables and conductors. The proposed object will contribute to the growth of the company, which is constantly developing and increasing its capacity. An ambitious investor also includes further product development by cooperating with Brno R & D institutions. The object is designed in rectangular shapes that copy the plot and the surrounding area of the industrial zone. The building is divided into two parts, a two-storey office building with facilities for employees and a production hall. Both of these objects are at the same height level that are joined together in the western part. From the eastern side, these two objects divide the half-closed atrium, which is open to Těžební Street. Thanks to regular column rafters, the entire building is designed as a prefabricated reinforced concrete skeleton, covered with kingspan sandwich panels and a partially glazed facade made of profiled glass call profilit that illuminates the entire interior of the building. The entire building is wheelchair accessible and offers plenty of space for both staff and visitors to park.

National Repository of Grey Literature : 27 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.